Close Menu

    Closings

    Facebook X (Twitter) Instagram
    • Personalities/Staff
    • Jobs
    • Calendar
    • Contest Rules
    • Contact Us
    • Privacy Policy
    • Login
    RSS Facebook X (Twitter)
    News Radio KMAN
    • Local/State News
      • Manhattan
      • Wamego
      • Riley County
      • Pottawatomie County
      • Fort Riley
      • Geary County
      • State News
      • RCPD Reports
    • Weather
    • Sports
      • K-State Sports
      • High School Sports
        • HS Basketball Schedule & Scores
          • Manhattan High
          • Wamego
          • Rock Creek
          • Riley County
          • Frankfort
          • Blue Valley High
      • Scoreboard Saturday
      • Student-Athlete of the Week
    • Podcasts
      • Within Reason with Mike Matson
      • The Game
      • Wildcat Insider
      • Scoreboard Saturday
    • Obituaries
    • Message Us
      • Birthday/Anniversary
    • Keep It Local
    Listen
    Closings And Delaystyle=
    News Radio KMAN
    You are at:Home»Local News»Airport Terminal Groundbreaking Expansion Set For Friday

    Airport Terminal Groundbreaking Expansion Set For Friday

    0
    By KMAN Staff on October 29, 2013 Local News, Manhattan, Riley County

    AIRPORT SCAN PIC

    The City of Manhattan will celebrate the commencement of construction to expand the terminal at Manhattan Regional Airport (MHK) during a groundbreaking ceremony at 9 a.m. Friday, November 1, 2013, near the front entrance to the existing terminal.

    Construction plans call for an expansion of the terminal building from 12,500 square feet to approximately 42,000 square feet, which includes two enclosed passenger boarding bridges. The airport will remain fully operational during construction, with the work taking place in two phases. The Weitz Company LLC of Lenexa, Kansas, is the general contractor for the project.

    “The terminal expansion at Manhattan Regional Airport is key to servicing the residents and business needs of our growing community,” stated Manhattan Mayor John Matta. “Regional needs include those of Fort Riley and Kansas State University as well as those that will come online with the completion of the National Bio and Agro-Defense Facility. In addition, Manhattan has a strong base of home-grown entrepreneurs and new businesses that are the driving force behind the region’s growth.”

    The need for terminal expansion became evident following the start of regional jet service to Dallas-Fort Worth. The size of the needed expansion was determined by completing a Federal Aviation Administration-supported Terminal Master Plan in 2011. The number of passengers using the airport has increased annually since regional jet service began at Manhattan Regional Airport in 2009. More than 125,000 passengers passed through the terminal in 2012.

    “As more than two years of planning and design come to a close, this groundbreaking event marks a new beginning for Manhattan Regional Airport,” stated Airport Director Peter VanKuren. “Designed to meet the long-range regional demand for air service, the bright and exciting future of commercial air service in the Flint Hills begins now.”

    The expanded terminal will better accommodate passengers on American Eagle’s daily flights to Chicago O’Hare and Dallas-Fort Worth airports. Additionally, Allegiant Air is scheduled to begin offering twice-weekly flights to Phoenix-Mesa Airport on November 7, 2013.

    The $15.8 million project is being funded through grants from the Federal Aviation Administration and City of Manhattan funding.

    “The terminal expansion for which we are breaking ground is critical to meeting the needs of passengers arriving and departing our region,” stated Airport Advisory Board Chairman Dick Hayter. “Manhattan is fortunate to have a close partnership with the Federal Aviation Administration in providing the support needed for this expansion.”

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    KMAN Staff
    • Website
    • Facebook
    • X (Twitter)

    Related Posts

    Manhattan High implementing zero-tolerance policy for cell phones

    City to receive updates on housing projects, street maintenance and cemetery improvements

    Manhattan residents face meth charges; bond set at $60k and $27k

    Listen Live Here
    Listen Live - Mobile

    Categories

    EEO Report

    FCC Public File

    FCC Applications


    Follow @1350kman on Twitter · Manhattan Broadcasting Company is an equal opportunity employer.
    Manhattan Broadcasting does not discriminate in sale of advertising on the basis of race, gender, or ethnicity, and will not accept advertising which does so discriminate. © 2024 Manhattan Broadcasting Company.

    Follow @1350kman on Twitter · Manhattan Broadcasting Company is an equal opportunity employer.
    Manhattan Broadcasting does not discriminate in sale of advertising on the basis of race, gender, or ethnicity, and will not accept advertising which does so discriminate. © 2024 Manhattan Broadcasting Company.

    Type above and press Enter to search. Press Esc to cancel.

    x