Close Menu

    Closings

    Facebook X (Twitter) Instagram
    • Personalities/Staff
    • Jobs
    • Calendar
    • Contest Rules
    • Contact Us
    • Privacy Policy
    • Login
    RSS Facebook X (Twitter)
    News Radio KMAN
    • Local/State News
      • Manhattan
      • Wamego
      • Riley County
      • Pottawatomie County
      • Fort Riley
      • Geary County
      • State News
      • RCPD Reports
    • Weather
    • Sports
      • K-State Sports
      • High School Sports
        • HS Basketball Schedule & Scores
          • Manhattan High
          • Wamego
          • Rock Creek
          • Riley County
          • Frankfort
          • Blue Valley High
      • Scoreboard Saturday
      • Student-Athlete of the Week
    • Podcasts
      • Within Reason with Mike Matson
      • The Game
      • Wildcat Insider
      • Scoreboard Saturday
    • Obituaries
    • Message Us
      • Birthday/Anniversary
    • Keep It Local
    Listen
    Closings And Delaystyle=
    News Radio KMAN
    You are at:Home»Local News»KDOT Work On Highway 24

    KDOT Work On Highway 24

    0
    By KMAN Staff on June 10, 2013 Local News, Manhattan, Pottawatomie County, Riley County, Top Story, Wamego

    KDOT Blue Gold
    On Monday, June 10, a resurfacing project will begin on a 22.52-mile stretch of U.S. 24 in Riley and Pottawatomie Counties. Resurfacing work will take place on the following portions of U.S. 24: from the east U.S. 77 junction east to the K-13 junction (Riley County); from the east Riley County line to Excel Road (Pottawatomie County); and the eastbound lanes only from Excel Road to Wamego (Pottawatomie County). Project work includes a 1.5-inch surface mill and 1.5-inch asphalt overlay on mainline lanes. Work will take place during daylight hours, Monday through Friday, with some occasional Saturday work. The work will be coordinated so that all lanes will be opened to traffic by one-half before sunset.

    Beginning on Monday, June 10, eastbound and westbound U.S. 24 will be reduced to one lane for both directions as crews begin work at the north end of the project at the east U.S. 77 junction and move south. Traffic will be reduced to one lane for both directions on the two-lane portions and reduced to one lane each direction on the four-lane portions of U.S. 24, along with intermittent closures of adjacent cross roads during the project work hours.

    Traffic will be directed through the project work zone on the two-lane portions via a pilot car and flagger operation and on the four-lane portions via lane closures. Drivers should expect delays of up to 15 minutes maximum and are encouraged to use alternate routes, if possible. There will be a 12-foot lane width restriction and a reduced speed limit on the portions that are directed via the pilot car and flagger operations. No large structures or superloads will be allowed through the project work zone.

    The Kansas Department of Transportation urges all motorists to be alert, obey the warning signs, and “Give ‘Em a Brake!” when approaching and driving through the project work zone.

    Shilling Construction Co., Inc. & Subsidiaries (Manhattan, KS) is the primary contractor on this resurfacing project with a total contract cost of $3.053 million. Overall project work is scheduled to be completed in mid-October 2013, weather permitting.

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    KMAN Staff
    • Website
    • Facebook
    • X (Twitter)

    Related Posts

    City to receive updates on housing projects, street maintenance and cemetery improvements

    Manhattan residents face meth charges; bond set at $60k and $27k

    Flint Hills Breadbasket moves in to new, expanded location

    Listen Live Here
    Listen Live - Mobile

    Categories

    EEO Report

    FCC Public File

    FCC Applications


    Follow @1350kman on Twitter · Manhattan Broadcasting Company is an equal opportunity employer.
    Manhattan Broadcasting does not discriminate in sale of advertising on the basis of race, gender, or ethnicity, and will not accept advertising which does so discriminate. © 2024 Manhattan Broadcasting Company.

    Follow @1350kman on Twitter · Manhattan Broadcasting Company is an equal opportunity employer.
    Manhattan Broadcasting does not discriminate in sale of advertising on the basis of race, gender, or ethnicity, and will not accept advertising which does so discriminate. © 2024 Manhattan Broadcasting Company.

    Type above and press Enter to search. Press Esc to cancel.

    x